Project Al Furqan
The project site is centrally located in Stoke on Trent within a mile of the City Centre and close by to many neighbouring amenities including the City’s first Independent Muslim School.
The land on which the Masjid will be built has been donated generously thereby reducing the overall financial costs of the project considerably (may Allah reward the families involved immensely). Since then planning permission was sought from the Local Authority and by the permission of Allah was granted with ease Walillahilhamd
Latest Update
Funds collected and work completed Alhamdulillah!
Funds collected and work completed Alhamdulillah!
Internal works relating to Phase 3 of the project have now commenced. We still require a further £36,000 in order for Phase 3 to be complete by December 2018. For details relating to the Phase 3 components, please refer to the breakdown table below
Funding Breakdown
Funding for the this noble project has been divided into 3 phases. Each Phase is outlined with a breakdown

Foundations
- 1A Piling
- 1B Ground Beams
- 1C Block and Beam

Main Structure
- 2A Groud Floor
- 2B Upper floor
- 2C Roof
- 2D Stairs
- 2E External walls (including others)
- 2F Windows and external doors (Included in element 2E)
- 2G Internal walls and partitions

Internal Finishes
- 3A Wall finishes
- 3B Floor finishes (Inc Carpet, Tiles where applicable)
- 3C Ceiling finishes
- 4 Fittings Inc Others
- 4A Sanitary Installation inc fitting (Toilets)
- 4B Cubicles
- 4C Basins
- 4D Skirting
- 4E Kitchen Fitting
- 4F Internal doors
- 5 Services
- 5A Electrical distribution and lighting
- 5B Water Installation
- 5C Drainage
- 5D External Services